Business
Access to Transportation
Access to Transportation
- Classification
- Main arterial road (motorway)
- Design speed
- 80km / h
- Road width
- 4-lane roadway (B=20m)
- Length
- 9,345km
- Major Structure
- Bridge: 2.195km,
Tunnel: 1.9km
- Main Intersection
- Airport IC, Namcheonseong IC, Gadeok Junction
- Implementer
- Ministry of Land, Infrastructure and Transport, Busan Regional Construction and Management Administration
- Classification
- General railway
- Design Speed
- 200km / h
- Sub-base Classification
- Double-track railway
- Length
- 16,526km
- Major Structure
- Bridge : 0.120km,
Tunnel : 16.106km
- Station
- 1 station(New Airport Station)
- Implementer
- Korea National Railway