Access to Transportation

Developing plans to ensure punctuality and accessibility for airport users, streamline air cargo transportation, and activate support, commercial, and logistics facilities in surrounding areas.

Classification
Main arterial road (motorway)
Design speed
80km / h
Road width
4-lane roadway (B=20m)
Length
9,345km
Major Structure
Bridge (2.195km),
Tunnel : (1.9km)
Main Intersection
Airport IC, Namcheonseong IC, Gadeok Junction
Implementer
Ministry of Land, Infrastructure and Transport., Busan Regional Construction and Management Administration

Designing a railway network to enhance access to Gadeokdo New Airport for the users from Busan, Ulsan, and Gyeongnam, seamlessly integrating it with existing railway system.

Classification
General railway
Design Speed
200km / h
Sub-base Classification
Double-track railway
Length
16,526km
Major Structure
Bridge : 0.120km,
Tunnel : 16.106km
Station
1 station(New Airport Station)
Implementer
Korea National Railway